top of page


42-Inch Parallel Water Main – DWSD WS-681
Start date:
2014
completion date:
2015
client:
DSWD
CONTRACT PRICE:
$29.7 Million
The project involves furnishing, installing, chlorinating, flushing, and testing approximately 35,332 linear feet of 42-inch diameter Prestressed Concrete Embedded Steel Cylinder Pipe (ECP), along with all necessary fittings, appurtenances, connections, and related structures as outlined in the project’s drawings and specifications. Pipe boring and jacking will be utilized at specific points where the water main must cross under the Newland Drain, the Middle Branch of the Clinton River, the Kingsbury Drain, the M-53 bridge crossing, the Harris Drain, and the Macomb Drain.
bottom of page