66 - Inch Transmission Main Bricker Rd.
Start date:
2017
completion date:
2019
client:
KWA
CONTRACT PRICE:
$14.9 Million
Install approximately 64,262 linear feet of 66-inch steel raw water transmission pipeline, designed to withstand a pressure of 200 psi, from Bricker Road to the Intermediate Pump Station. This extensive project involves laying out the large-diameter steel pipeline across a significant distance, ensuring that it adheres to stringent engineering standards for water transmission. The pipeline will be equipped with necessary fittings, valves, and potentially hydrants for maintenance and operational efficiency. The steel material is chosen for its durability and ability to handle high pressure, which is crucial for maintaining the integrity of raw water supply over long distances. This endeavor requires precise planning for route selection, acquisition of rights-of-way, and careful consideration of the environmental impact, along with coordination with local regulatory bodies to ensure compliance with safety and environmental regulations. The completion of
this pipeline will significantly enhance the capacity and reliability of water supply from the source to the treatment facilities, serving growing urban and industrial needs.